Installation and Upgrading
35
NetLinx Integrated Controllers
7. Slide the unit into the rack until the attachment holes, along both sides, align to their
corresponding locations on the mounting brackets, as shown in FIG. 22.
8. Secure the Rack Mount to the equipment rack by screwing in the four #10-32 screws (80-0186)
and four #10 washers (80-0342) supplied in the Assembly Kit (KA2105-01) (in a clockwise
direction).
9. Connect the terminal NetLinx wiring to the Central Controller, DB9, Ethernet, and ICSNet
wiring to the NI Integrated Controller.
10. Apply power to the unit by using an active PSN power supply.
Comments to this Manuals