AMX BCS Technical Information Page 25

  • Download
  • Add to my manuals
  • Print
  • Page
    / 47
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 24
Building automation wiring diagram for Forest Shuttle
For control of a Forest Shuttle by a building automation system an actor is needed. If the building automation system already has relay outputs, then an actor is not
needed. The relays output must be dead! (free of potential)
Different brands and protocols are possible, in this diagram the basic principle is shown. Used in this diagram is KNX, but can also be AMX, Lutron, Creston etc.
Depending of the kind of switching, the manual input of the Shuttle must be reprogrammed, like on page 26 of the user and installation manual (option 2).
07/2012 WDOC ACTOR SHUTTLE www.forestgroup.nl
25
Page view 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 46 47

Comments to this Manuals

No comments